Tower assembly sequence




1 stage:

Unscrew the screw supports so that the wheels do not touch the surface, place two bases (1) on a flat plane, parallel and connect them with the volume diagonal (2), install the volume diagonal in the glasses of the bases.

The assembly sequence of the towers tour VSP 250 and PSRV, stage 1

2 stage:

Insert the stairs of the section (3) into the glasses of the bases

ATTENTION! The upper and lower parts of the intermediate section must not be confused!

The assembly sequence of the towers tour VSP 250 and PSRV, stage 2

3 stage:

Mount the dumbbells (4) and fix the resulting assembly with eight ties (5)

The assembly sequence of the towers tour VSP 250 and PSRV, stage 3

4 stage:

Assembling the tower to the desired height, we set the volumetric diagonal (2) in every fourth intermediate section

The assembly sequence of the towers tour VSP 250 and PSRV, stage 4

5 stage:

The assembly of the tower ends with the assembly of the fence section, which consists of two fence ladders (6), two fence dumbbells (7), two guard rails (8) and eight ties for structural strength (5)

The assembly sequence of the towers tour VSP 250 and PSRV, stage 5

6 stage:

Flooring with hatch (10) and flooring without hatch (9.11)

The assembly sequence of the towers tour VSP 250 and PSRV, stage 6